Dear Readers: If you have any problem with your projects kindly Contact Us ====> 0321-7236655


Pages

Tuesday, 24 January 2012

list-of-final-yeasr-projects

 

 

LIST OF FINAL YEAR PROJECTS

 

LIST OF FINAL YEAR PROJECTS IN LAHORE PAKISTAN

  1. GSM(sim 900) BASED SINGLE PHASE TRANSFORMER PROTECTION 
  2.   Automatic Generator Protection
  3.  TAPE CHANGING TRANSFORMER
  4. Design and Implementation of  Prepaid Energy Metering
  5. To Control the Real Speed of DC Motor using PID controlled method & Micro-Controller
  6. Design of the closed loop Speedy control system for DC Motor
  7. LOAD MANAGEMENT at small grid station
  8. power-generation-using-speed-breakers
  9. AUTOMATIC LOAD MANAGEMENT AT GRID STATION AND SEND ON G S M
  10. Power Analyser for power house
  11. induction motor speed control
  12. 3 phase induction motor speed control 
  13. GSM BASED SMART SENSOR FOR INDUSTRIAL AUTOMATIC FAULT DIAGNOSER WITH  VOICE FACILITY
  14. SMART AMBULANCE
  15. GSM(SIM900  GSM MODULE) BASED HOME SECURETY
  16. gsm-gps-based-school-kids-tracking
  17. PC TO PC laser  COMMUNICATION
  18. INTELLIGENT TRAFIC CONTROL SYSTEM 
  19. SMS based Stepper Motor Control 
  20. gps based  nevigation system   using globle poistioning system  trackig different location and correct path find
  21. ROBOTIC ARM
  22. INTELLIGENT SPY ROBOT
  23. SOLAR TRACKER
  24.  SMS  CONTROL ROBOT 
  25. auto matic vacuumm cleaner robot 
  26. multi tasking robot  for multi purpose


Twitter Delicious Facebook Digg Stumbleupon Favorites More

 

Recent Posts

Join Me On Facebook

700+ Followers

Followers

Recent Comments

Follow Me On Twitter

1112+ Followers